Aircraft management: how to read the contract and the statement.

How a manager makes money, the clauses worth a second reading, a monthly statement read line by line and the questions to put to any manager before you sign.

Reviewed on 12 November 2026 · 6 min read

Disputes between owner and manager tend to start with a line on the statement that nobody can explain: a margin on fuel that was never agreed, a part with no invoice, an hour of hangarage charged twice. The answer was almost always in the contract, or should have been.

This guide works for any management contract, ours included. If a manager cannot answer the questions at the end with a document, that in itself tells you something.

How the manager makes money.

Every aircraft expense is billed in one of four ways. A clear contract states which one applies to each item in the scope.

MethodHow it shows on the statementWhat to ask
Inside the management feeIt has no line of its ownWhich items does the fee cover, and what is its formula?
Passed through at costThe amount on the supplier invoiceIs the invoice attached?
Passed through with a declared marginCost and margin on separate linesWhat is the margin per category, such as fuel, parts and third-party services?
Own feeA manager service at a list priceWhere is the price list, and when does it change?

None of the four is wrong. The problem is the margin that is not written down. A manager buying fuel, insurance and training in volume for several aircraft gets prices a single owner cannot, and it is fair for the manager to keep part of that saving, provided you know how much.

The clauses to read twice.

  • The scope lists every item, including those that do not apply to your aircraft, with the billing method for each.
  • The contract states who is registered as operator in the Brazilian Aeronautical Registry (RAB) and who employs the crew.
  • There is a spending limit per category that the manager can approve without you, and a lower limit for unscheduled maintenance.
  • Approval is never tacit: if you do not reply, nothing above the limit is contracted.
  • The aircraft money sits in a segregated account, kept apart from the manager’s own cash.
  • The maintenance reserve has an hourly rate, sub-accounts and a written drawdown rule.
  • The statement has a delivery deadline, and you can dispute one line without holding up the rest.
  • On exit, the technical records come back with a signed inventory and the balances come back under a written rule.

A statement, line by line.

Below is one month for a midsize jet with three trips and 22 flight hours. The figures are illustrative. The structure is the one a statement should have.

Illustrative monthly statement

Hangarage, passed through at cost
R$ 18,000
Insurance, monthly share of the annual premium
R$ 9,500
Crew: salaries and payroll charges
R$ 92,000
Management fee, fixed by contract
R$ 25,000
Fuel: 4,200 L × R$ 7.80
R$ 32,760
Maintenance reserve: 22 h × R$ 1,500
R$ 33,000
Airport fees and handling, 3 trips
R$ 6,400
Crew per diems and hotels
R$ 4,800
Total for the month
R$ 221,460
Illustrative figures. On a real statement, every line leads to its source document: the tax invoice, the supplier invoice, the reserve entry or the flight record.

Look first at the fuel. The line shows the volume and the price per litre, and the supplier invoice is attached. The maintenance reserve is your money set aside for future events, and it stays yours until it is spent on an approved event. Fixed costs such as hangarage, insurance and crew appear even in a month with no flying, which is why the cost per hour falls as the aircraft flies more.

The maintenance reserve.

The reserve is built from a contribution per flight hour, calculated from the technical log, and split into sub-accounts such as engines, APU, inspections and airframe. It should only be drawn against an approved maintenance event, with a quote and proof of payment. Once a year, the hourly rate needs to be checked against the projection of events ahead.

A sub-account that does not add up

Major inspection due in 30 months, estimated cost
R$ 1,200,000
Current sub-account balance
R$ 520,000
Contributions: 22 h a month × R$ 800 × 30 months
R$ 528,000
Shortfall on the inspection date
R$ 152,000
Illustrative figures. With this projection, you decide whether to raise the hourly contribution or schedule a one-off top-up. Without it, the bill arrives when the aircraft is already grounded.

Questions for any manager.

  1. Can I see a real statement from another aircraft, with the client details removed?
  2. What is your margin per expense category, and where does it show on the statement?
  3. Which account holds my money, and who can move it?
  4. How much do you approve without asking me, and what happens if I do not reply?
  5. How many quotes do you request before a major maintenance event, and do I see the comparison?
  6. Who is the operator of the aircraft and who employs the pilots?
  7. What volume discounts do you have on fuel, insurance and training, and how much of them reaches me?
  8. If I leave, how long until I receive the records and the balances?

Our answers are in the contract we propose: costs with the supplier invoice attached, segregated accounts reconciled every day, approval that is never tacit and at least three quotes from approved maintenance organisations before any maintenance above the limit.

On exit.

A good management contract makes its own exit easy. The technical records come back in order, with a signed inventory, and any missing document is recorded as missing. Reserve and fund balances come back under the written rule, and an open expense is only offset with a document and your agreement. The insurance policy and the hangarage are assigned or terminated, and the operator link in the RAB is cancelled.

Questions

Questions about this guide.

Can the statement be treated as accepted without my reply?

Only if the contract has a tacit acceptance clause, and even then only after the dispute period. Disputing one line does not prevent the other lines from being accepted.

What if the aircraft is grounded away from base?

The contract can set a specific limit for an aircraft on ground (AOG), separate from the category limits. Above it, nothing is contracted without your approval, and the director of management speaks to you directly.

How do you assess the aircraft before making a proposal?

We ask for the statements and invoices from the last 24 months, sort the costs into the contract categories and show your current costs next to ours, marking what is proven and what is estimated. The technical lead inspects the aircraft and reviews the records and the upcoming inspections.

Who in my company can approve expenses?

You name the people and their limits. A reply sent from an address or number that is not registered is logged as a message and has no effect as an approval.